LawGrids logoLAWGRIDS.ORG

8.5 Authorizing entities to lay, build, operate or expand natural gas pipelines, Amendment Regulation, 2010

Regulations made under The Petroleum and Natural Gas Regulatory Board Act, 2006

This text is shown as one document.

Full text

PT Fo Sto Weo-33004/99 Ata Che Gazette of India EXTRAORDINARY WMT [I—avs 3—3q-WGvgs (i) PART —Section 3—-Sub-section (i) REGD. NO. D.1L.-33004/99 wifrere 8 weiora PUBLISHED BY AUTHORITY a. 387] ag facet, WHat, WHS 9, 2010/3TATE 18, 1932 . No. 387] NEW DELHI, FRIDAY, JULY 9, 2010/ASADHA 18, 1932 Veterans sit wreafeer trea fatrama as “(3) art até wi sa-faftan (1) & atria faite srfergert aa eit at aagta area aT Sat at afte Tet SM al atta & ws St sed feat st stave S stax ag facet, 9 yong, 2010 wae"; aia, 594(st).—talferas ait orefers te (1) fafraa 10 8 sofas (4) 8 we at ate fea” fararen até afitfran, 2006 (2006 1 19) Bt URI 61 STI weal Ra ON “wae a area fea” wre Whreenfra wee wear at wat wet ET telferas ik wepfre te fru aT; ne we aire repos te afar Ca) fafran 14 @ 3u-fafras (1) HVS (H), (G) ate Gongita te evar er, Fa, eT aT ABR se) & fae frerfates oheeentia Gen we = fa wfaqa en) fafa, 2008 A deter aa oe Ferg “Tk, feu frafefies fafraa sara %, aad: — oe 1. (1) fare tetferan ote oregfier te fafa (HRT feu: we (wafer ta agent faer, Frater, wares — @ wate ta & oftaer & anfie cer S <a wire TR ee & fare wise Se) Aetes fata, we at aan feu frere ais a uf a <a 2010 Het ATE | wafer; (2) dared ws 4 at veRm st ate 8 wa Gi) wafer ta S aftaer S afte cers <a wferera a | a afte vere vlog dae at ae a fare Freres ‘ais sat afer ar ate vfaera; 2. Vetferaa sik wrenfaer the fara até (areata Ta ITE faor, frato, wae a fem we Ss faw Gi) wrpfee ta vitae & cite cea se Tara wifi een) fatter, 2008 F— BOO Se ee IRE fet art Testa wfaera (@) fafran s @ 3o-fafran (8) Fae fea” wal & za w]e wae at ate fer” we vfaeenfir fra (a) qed ya fer we; @ wefrr te & oftaer $ afte cer} ae vier (a) fafran 10 @ so-fatraa (3) & few frafetad aH al ae @ fee Frome aie =e uf a ate Yracenfid frat are, Ard: -— afer; 2630 GI/2010 (1) 2 THE GAZETTE OF INDIA : EXTRAORDINARY Gi) wafer te $ waer S afte cea S <a wher a after dare wfterd we at ga S fare fron ais at uf a areite via; Gi) waft tea é wkasr S afte wea} cae wierd o afi ce al ye am fee Fone ais cat Uf ar Tare Ufae; (1) Gad qa & faa: Prearet ais ct uit wr wae St ware” | [WL G. Wa-WeMA7/I1/8/2010] TH O. aaa, aaa we feauit—ae fatal et aah. 340(31), feria 6, AR 2008 are sifirgfad fare wen em atk aaa FAA Ta. 802(31), fata 19 Aaa, 2008 AM AHL. 769(31), fers 20 staqar, 2009 gr axitfa fran aT AT | PETROLEUM AND NATURAL GAS REGULAROTY BOARD NOTIFICATION New Delhi, the 9th July, 2010 G.S.R. 594(E).—In exercise of the powers conferred by Section 61 of the Petroleum and Natural Gas Regulatory Board Act, 2006 (19 of 2006), the Petroleum and Natural Gas Regulatory Board hereby makes the following regulations to amend the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build, Operate or Expand Natural Gas Pipelines) Regulations, 2008, namely :— 1. (1) These regulations may be called the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build, Operate or Expand Natural Gas Pipelines) Amendment Regulations, 2010. (2) They shall come into force on the date of their publication in the Official Gazette. 2. Inthe Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build, Operate or Expand Natural Gas Pipelines) Regulations, 2008,— (a) in sub-regulation (8) of regualation 5, for the words “sixty days”, the words “one hundred and twenty days” shall be substituted; [Part II—Sec. 3(i)] (b) for sub-regulation (3) of regualation 10, the following shall be substituted, namely :— “G) the entity shall submit Heads of Agreement or Memorandum of Understanding or both specified under sub-regulation (1) to the Board within a period of one hundred and eighty days of the date of issue of the authorisation”; (c) insub-regulation (4) of regulation 10, for the words “one hundred and twenty days”, the words “one hundred and eighty days” shall be substituted; (d) for clauses (a), (b) and (c) of sub-regulation 1 of regulation 14, the following shall be substituted, namely :— “(a) for the first default : (i) ten per cent of the amount of the performance bond for the default up to ten per cent of annual target of transporting natural gas; (i) twenty per cent of the amount of the performance bond for the default up to fifty per cent above ten per cent of annual target of transporting natural gas; (iii) twenty five per cent of the amount of the performance bond for the default above fifty per cent of annual target of transporting natural gas; (b) for the second default : (i) twenty per cent of the amount of the performance bond for the default up to ten per cent of annual target of transporting natural gas; (ii) forty per cent of the amount of the performance bond for the default up to fifty per cent above ten per cent of annual target of transporting natural _ gas; (iii) fifty per cent of the amount of the performance bond for the default above fifty per cent of annual target of transporting natural gas; (c) for the third default : one hundred per cent of the amount of the performance bond”. [F. No. S-Admn./II/8/2010] RATAN P. WATAL, Secy. Foot note.—Principal regulations were notified vide No. G.S.R. 340(E), dated 6th May, 2008 and subsequently amended vide G.S.R. 802(E), dated 19th November, 2008 and G.S.R. 769(E), dated 20th October, 2009. Printed by the Manager, Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.