8.2 Authorizing entities to lay, build, operate or expand natural gas pipelines, Amendment Regulation, 2009
Regulations made under The Petroleum and Natural Gas Regulatory Board Act, 2006
This text is shown as one document.
Full text
UseSt Fo Elo Ueo-33004/99
REGD. NO. D. L.-33004/99
Gazette of India
EXTRAORDINARY
aT W—ave 3—s4-UveE (i)
PART Il-—Section 3—Sub-section (i)
Uitte a varia
PUBLISHED BY AUTHORITY
a. 610) ag feect, wear, 3 2009 /3mfeat 28, 1931
No. 610] NEW DELHI, TUESDAY, OCTOBER 20, 2009/ASVINA 28, 1931
teifeaan sit wenfas ta fatame ard at Fh 1% a frmeqs ara eT aH Wife
aR
ag face, 20 ataqaz, 2009
alah, 769(3).—azifan sik wefas te
Tara ats stats, 2006 (2006 Sl 19) At A 61 SRI
are (arnt & wrepiae te ascend fae, fra, area
a fac ae =m fer afiera ae) fafraa, 2008 4
aie ae @ fac frafafaa fates sara 2, arta:
(1) 3 fattest at teiferas sik wefan ita fafa
Waren a faa ae & few wit Seat) Baie fata,
2009 Het SET |
(2) 4 oat tsa FY sam WHEN St athe a
vga ei |
2. Valfers att orepfas te fata ate (areata
al wepfes Te uscd fae, frat, wares a fae
oe & feu wfpa Ser) fafras, 2008 & fafran 8 >
for Prafetad ufacentta frat ore, aaa: —
“3. fread as
(1) 817 Bt Sd-aT (1) & Wes 4H sieafaa
Ss SHR Bre feu Te aqaeT dean ahaha Ht
UR 19 & Aad He Ent fey AW sqaier al
watpfa Set HT ast aNt al omeit sa ae
aera taste et arta oRatsrr
3778 GI/2009
wl waist & few often wipe aria
1% Ut 20 Hes vay, St Ht HA sl, H aaa |
a at wp fered sie geqa HUN an ae
fafaa 4,17, 18 319 & Hata wilhta ast
WSveneal Wl APL EMT :
TRAY ale TSteNeA AAAI Al Seat Wilsa AAT
H Tae vasa a ates am fae fear aa @
at Frener ae al of H ara F Fer SoM
SU
erctanror—ate fata 10 & arqan facia santa
& YE eh an aaa saisen ysitea arma
& aI WR aaa wats ara 4 uftada
aa @ a frenea ais at ate A sadea ora
TR Beifie fear SET | Ta Ht USTeSa OTe
Hq gfe am faa at tt aenfea oats pst
ama at ear AY war sre | wees A frees
ats am a ota ad am at statis & fer ae am
aat eet sae fad aka WHA HA UH
aul & ariel ite a fa acta fear seo |
(2) fracas ate sa-fafaan (3) A fratia aeat
& aqan weatad wales te WSs Ht AAT
Te ear Se at UR MA cen “as
2 THE GAZETTE OF INDIA : EXTRAORDINARY [Part I—Sec. 3(i)|
Tae WOH SRA Het sr dar seat
Aya aa, det ot feat a, S fae Fratita
fea va @ 1 até ge free ais at ait
asvereat & fare Sat Sa S yarn se Stet fe
St ee, HES DS tik
fara maz |
(3) wert wt wepfae te ogensa tka at
Tar few aqaies 34 at ante S wctta
He at aftepag safe, sat ot feerfa ei, ver
at set | aenfa, afe até ae act at fe facta
& SRY URS Hl HMaaa HH elt HAT
® faa Sw, a aS Frova sik oe eu
S srgqaa shea st wad @, sik He fae
aafy ot ver at Gam 2 ot ae oRaseT at
ear & faa sfaa Gaga Bt" 1
* [. G. WA-GM./11/8/2009-asS-1 J
Ta 4. ada, ahaa
ue fants tea fafraa a. ararfa. 340(31) feta
a 2008 amt afirgfad far me a an
acqear SAH GLA. 802(21), feats
19 Faraz, 2008 ere aenert fare Ta eT |
PETROLEUM AND NATURAL GAS
REGULATORY BOARD
NOTIFICATION
New Delhi, the 20th October, 2009
G.S.R. 769(E).—In exercise of the powers conferred
by Section 61 of the Petroleum and Natural Gas Regulatory
Board Act, 2006 (19 of 2006), the Petroleum and Natural
Gas Regulatory Board hereby makes the following
regulations to amend the Petroleum and Natural Gas
Regulatory Board (Authorizing Entities to Lay, Build,
Operate or Expand Natural Gas Pipelines) Regulations, 2008,
namely :—
(1) These Regulations may be called the Petroleum
and Natural Gass Regulatory Board (Authorizing Entities
to Lay, Build, Operate or Expand Natural Gas Pipelines)
Regulations, 2009.
(2) They shall come into force on the date of their
publication in the Official Gazette.
2. In the Petroleum and Natural Gas Regulatory
Board (Authorizing Entities to Lay, Build, Operate or
Expand Natural Gas Pipelines) Regulations, 2008, for
regulation 8, the following shall be substituted, namely :—
“8 Performance bond.
(1) Acceptance to the grant of authorization given
by the Central Government referred to in
proviso to sub-section (1) of Section 17 and
grant of authorisation by the Board under
Section 19 of the Act shall be issued to the
entity after it furnishes a performance bond of
an amount equal to 1% of the estimated project
cost for the project under execution or 1% of the
project capitalized cost.for the completed
projects rounded off the nearest lakh rupees or
Rs. 20 crores, whichever is less and it shal! be
applicable to all pipelines authorized under regu-
lation 4, 17, 18 or 19:
Provided that in case the pipeline capacity is
expanded for more than fifty per cent of its
authorized capacity, the performance bond shall
be increased in proportion to the increase and
shall be rounded off to the nearest lakh rupees
subject to a total celing of Rs. thirty crores.
Explanation—The amount of the performance
bond shall be revised by applying the above
basis in case the estimated project cost under-
goes a change on completion of the financial
closure as per regulation 10 and subsequently
based on the project capitalized cost. When-
ever there is expansion or extention of the
pipeline system the modified project capitalized
cost shall be taken into account. The
performance bond shall be initially valid for a
period of three to five years and shall be
renewed by the entity for the next block of three
to five years, at least one month before the due
date, upto the economic life of the project.
(2) The performance bond has been prescribed for
guaranteeing the timely commissioning of the
proposed natural gas pipeline as per the targets
laid down in sub-regulation (3) and also for meet-
ing the service obligations by the entity during
the operating phase of the project as the case
may be. The performance bond shall be
encashed by the Board for all pipelines in the
similar manner as prescribed under regulation
14(1) under the bidding process.
(3) The entity shall be allowed a maximum period of
thirty six months from the date of grant of
authorization for commissioning of the natural
gas pipeline project as the case may be. How-
ever, if the Board is of the opinion that the
reasons for delay are beyond the control of the
entity implementing the project, the Board may
take an appropriate view in a fair and trans-
parent manner, and may aslo allow certain
extension period which it may deem fit for the
commissioning of the project”.
[F. No. S-Admn/II/8/2009-Vol. I]
RATAN P. WATAL, Sccy.
Foot Note :— The principal regulation were notified vide
No. G.S.R. 340(E), dated 6th May 2008 and
subsequently amended vide No. G.S.R.
802(E), dated 19th November, 2008.
Printed by the Manager, Government of India Press, Ring Road, Mayapuri, New Delhi-110064