The Patents and Designs (Extension of Time) Act 1950, 2 of 1950
Central Repealed act - Repealed
- Act 2 of 1950
Repealed
This Act is repealed. Note: (Rep., Act 36 of 1957)
This text is shown as one document.
Full text
An Act; to ~ r o v i case of displaded *personsfbr the extension or' uhder' the 'Indian Patefits and Designs ing sf acts thereunddp.
-
-
[18th February, 1960J e
1. Short title, extent and Designs (Extension od be called the Patenb aC
(2) It extends to the di
(3) It shall be in force for
In the said period section 6 of apply as if this Act had account of the setting up of civil disturbances or residing in India.
8. Power to extend time limits in the ease of any displaced perscln, the Control under the Indian Paten such conditions, if any, by or under that Act fo of the act by the displa causes connected with
(2) An extension u , f b ) may be granted, n~t~withstarlding that that xpired before any application or request for extension was made, or , by reason of thab act not having been done within that tlme, the rele plication, patent, registration or proceeding has censed or expired., ome void or in-valid, or been treate* as abandoned, or been refused.
(3) Where it appears to the Controller that an order all a$ Mme, if made, may prejudicially affect the interest of any subsequenb to the date on which the original application or ciispltieed person should have been completed, bas applied
Price aana .I or >lid. . \ < dine to the generality of the foregoin;
. .
e od aC di In