The Indian Patents and Designs (Extension of Time) Act, 1942, 10 of 1942
Central Repealed act - Repealed
- Act 10 of 1942
Repealed
This Act is repealed. Note: (Rep., Act 40 of 1949)
This text is shown as one document.
Full text
ACT No. X OF 1942.
[PASSEDBY THE INDIAN
-LEGISLATURB.] f
(Receiljed the assent of the Governor Qeneral on the 14th
, ,. March, 1942.)
. .
,An Act to pro.vide for the extension of the time limited by om under the Indian Patents and Designs Act, 1911, for the doing of acts thereunder.
{ REAS it is expedient to provide for the exten- 11 ,,flofi.
WH" sion of the time limited by or under the Indian
Patenb and Designs Act, 1911, for the doing of acts thereunder ;
It is hereby enacted as follows :-e
1. (1) This ~ c may t be called the Indian Patenta :+;;.
od and Designs (Extension of Time) Act, 1942. duration. . .
(2) Itextends to the whole of Britiah India.
aC
(3) It-shall be@ foroe_until the termination of the I present hostilities an?i for one year thereafter. i di
2. (I) The Controller of Patents and Designs ap- P O W W ~ ~ p~intedunder the Indian Patents and Designs Aot, 1911, ig:,"h",'zg 1
In folS1l.
may, subject to such conditions, if any, as he thinks fit ;,"E;$~Z~; 1I to impose, extend the time Limited by or under that Act for doing any act, where he is satisfied-
(a) t h a t the doing of the act within the time so . .
limited was prevented by a person's being on active service or by any other circumstances arising from the existence of the present hostilities which, in the opinion of the Con-troller, justify an extension of the time so limited, or %
(b) that, by reason of ciroum~tanaeearbing from the existence of the present hostilities, the doing of the act witihin the time so Limited wouM have been or would be injjuriou~to the rights or interests of the person by or on whose behalf the act iEl or was to be done or to the public interat.
$,+,,(2) An extendon under this motion of the time for doing any a c t p
( a ) may be for any period that,thei&ntroller thinks fit, notwithstanding that under the
1ndian
1
Price anna '1 or I@.
' .. ,
..
. . lndian Patents and Designs [AOT NO.x OF 1942.1 (Extension of Time).
Indian Patents and Designs Act, 1911, IIof 1911.
power is conferred to extend the time for doipg that act for a specxed period only ;
&a
(b) may be granted, notwithstanding that that time expirq before any application or reqt&t+'R&f e-&ension was made, or that, by reapon of that act n ~ having t been done within that t b , the relevant application, patent, registration or proceeding has ceased or expired, -or bioome void or invalid, or . been treated as abandoned, or been refused.
e od aC di
In